Silvery Olive
Verso
Product properties
Ready-to-use thin-layer levelling compound for interior use, for creating mineral floor and wall surfaces in dry and wet areas on PANDOMO Kudo Guard substrates.
1 Day(s)
| Bond strength |
|---|
| 2.7 N/mm² |
EC 1 PLUS = very low emission PLUS
None
None
Structure: 15 kg bucket,Texture: 10 kg bucket,Smooth: 5 kg bucket
| Time | Compressive strength of approx. |
|---|---|
| After 28 days | 65 N/mm² |
8
Bfl - S1
+5°C - +35°C
Yes
| Material requirements | Condition |
|---|---|
| 500 - 700 G per m² | PANDOMO Structure (0.5–0.7 mm) |
| 300 G per m² | PANDOMO Texture (0.3–0.5 mm) |
| 200 G per m² | PANDOMO Smooth (0.3–0.1 mm) |
Yes
AR4
| Time |
|---|
| 7 Days |
W3 ≤ 0.009 kg (m² × H^0.5)
EC 1 PLUS = very low emission PLUS
| Time | Condition |
|---|---|
| 3 - 4 Hours | Per shift |
| 12 Hours | Last layer |
| Condition | Density |
|---|---|
| PANDOMO Structure (0.5–0.7 mm) | 1.6 g/ml |
| PANDOMO Texture (0.3–0.5 mm) | 1.58 g/ml |
| PANDOMO Smooth (0.3–0.1 mm) | 1.55 g/ml |
Can be stored frost-free for approx. 12 months in the original sealed container.
product construction walls
PANDOMO PU Top Coat or PANDOMO Colour Intensifier
PANDOMO PU Primer or PANDOMO Colour Intensifier
2 x PANDOMO Verso
PANDOMO Deco Primer or ARDEX P 4 READY
product construction floors
PANDOMO PU Top Coat
PANDOMO Colour Intensifier or PANDOMO PU Primer
2nd layer: PANDOMO Verso pure
1st layer: PANDOMO Verso mixed with
PANDOMO Hard Grain, HG or ARDEX QS sand
PANDOMO Epoxy or ARDEX PANDOMO P 40 MS
Suitable ground